Owner manual

IP025-001 V3
IBL Lift Series Installation
07/05 Thor/Sales Info/Installation Materials/IBL Lift
16
9.) Raise the lift up – keep a close eye as the lower frame enters the enclosure/hole.
Center the closure panel left-to-right and front-to-rear. Tighten the CTB Bracket
and Slider hardware when completed.
NOTE:
Prepare the ceiling closure panel by painting it to match the existing ceiling.
Carefully raise the lift using the remote control.
Finally, adjust the rods so that the ceiling closure panel fits flush with the ceiling.
When adjusting the Closure Panel, the springs should compress about 1/8” to
1/4”.
¼-20 Rod Nut
Plastic Sleeve
Sprin
g
Flat Washer
¼-20 Nylock Nut
Closure Frame Rod
upper detail
(1522 model)
Closure Frame Rod
lower detail
No longer than 2”
above lift frame
Cut rods to length
for projector