Technical data

6
Central vacuum systems
Scheme of distribution of the pipe line for a system of 6 operators
A = horizontal pipe at the vertical descend Ø 100 – 63 – 6 operators
B = sweep TY Ø 100 – 6 operators
C = sweep TY Ø 80 – 3 operators
D = sweep TY Ø 63 – 2 operators
E = sweep TY Ø 50 – 1 operator
F = sweep reducer Ø 100/63 – from 4/6 to 2 operators
G = sweep reducer Ø 100/80 - from 4/6 to 3 operators
H = sweep reducer Ø 80/63 - from 3 to 2 operators
I = sweep reducer Ø 80/50 - from 3 to 1 operator
L = sweep reducer Ø 63/50 - from 2 to 1 operator
M = inspection cap Ø 100
N = By-pass valve Ø 100
* the maximal simultaneousness of the floors can not be added
The horizontal pipe line on the floor requests a maximal diameter
of 63 mm (2 operators working simultaneously). In the case it
is necessary to vacuum on the same floor with more than
2 operators, split the pipe line on the floor into zones.
ø 50
ø 50
ø 63
2 operators
ø 50
GROUND FLOOR
4 operators *
FIRST FLOOR
6 operators *
SECOND FLOOR
3 operators *
THIRD FLOOR
1 operator *
Central
unit
A - ø 100 - Total: 6 operators
B
B
B
B
B
B
B
D
C
C
D
D
DD
D
DD
DD
D
D
D
D
E
EE
EE
DDD
D
D
D
D
D
D
DD
D
E
EE
E
E
EE
E
E
E
E
E
G
F
F
F
F
F
H
H
I
L
L
L
L
L
LL
L
D
E
E
E
E
E
L
L
L
L
L
L
L
L
L
LLLLLL
L
L
E
E
LLL
L
L
M
N
ø 63
2 operators
ø 63
2 operators
ø 63
2 operators
ø 63
2 operators
ø 63
2 operators
ø 50
1 operator
ø 63
ø 50
1 operator
ø 50
1 operator
ø 50
1 operator
D
L
L
ø 50ø 80
ø 100
ø 100
Z 845