User's Manual

4 Installing an ODU AIM User’s Manual
38
The table below indicates which tasks need to be performed for each ODU. When
an installation includes two ODUs, you must perform the installation tasks for each
ODU. The AIM Install feature guides you through the tasks based on the selected
ODU.
When using the AIM to align an ODU, refer to the appropriate sections for
assistance:
Task A. Installation Setup” on page39
Task B. Coarse Azimuth Adjustment” on page40
Task C. Coarse Elevation Adjustment” on page40
Task D. Tilt Adjustment (95°, 3-LNB, Slimline-5, and Slimline-5S (SWiM) ODUs
Only)” on page41
Task E. Fine Elevation Adjustment (Slimline ODUs Only)” on page41
Task F. Fine Azimuth Adjustment (Slimline ODUs Only)” on page43