Specifications
© Systeme Lauer GmbH & Co KG • Kelterstr.59 • 72669 Unterensingen • Tel. (07022) 96 60-0 • Fax (07022) 96 60-103
B-7
B Buep 19-Expander driver
P3: General error message (bit, here A0.0)
The P3 general fault bit is set for any error in the connection between
the programmable controller and the PCS. This bit is automatically
reset as soon as the communication is running without a fault.
P4: Flag for the first processing of the handling block (bit, here
M20.0)
This flag should be reset before the first call of the handling block. At
the first execution, it is automatically set to 1.
P5: Flag bit for appeared timeout faults (here: M20.2)
P6: Time value for timeout monitoring (refer also to 1.4.3). Structure:
e.g. K2.2 = 2 seconds timeout
multiplication element 1 = 100 ms, 2 = 1 s
value
P7: Name of the used timer for timeout (here: T15)
P8: Flag bit for waiting for the first order (here: M20.1)
TRANSDB is the data block containing the send and receive buffers.
Must be 64 words in length. PCSDB is the information interchange
data block between the PCS and the programmable controller. Must
be 255 words in length.
B1.3 Implementation of the software
The README.DOC file on the PCS 91.BOS floppy disk contains current
notes concerning the use of the various projects.
The 200.0-213.7 flags are used as temporary flags by the communication
program. They may also be used by other programs as temporary flags.
The P7 timeout timer (here: T15) and the flags P4, P5 and P8 (here:
M20.0-M20.2) must not be used by other programs.
Implementation of the PLC software
• Equip the rack
• Set the digital I/O boards to address 0 (for this set all DILs to OFF)
• Copy the corresponding project stored on the PCS 91.BOS floppy
disk to the hard disk
• Supply voltage to the programmable controller
• Transfer the programmable controller program into the controller using
the loader (if necessary, link in your application program, correct the
configuration and link newly)
• Turn off power to the programmable controller (important!), remove
the programming cable, set the programmable controller interface
parameters (refer to 2.4), turn on power to the programmable
controller and set the mode switch to RUN
• Connect the PCS and the programmable controller using an comm-
unications cable described in sections 3 (are DIL-switch segments
5 and 6 at the PCS correspondingly set).
• Apply 24 volts for a short-term to input E0.0 (Precondition: 24 V
input module).