Technical data
SOLC220 - Free standing kit
Page 19 of 20
ST0117 – C 08/09
SOLAR
Step 5.1
- Please refer to the ‘On site guide’ for
details on pressure testing, testing for
leaks and proper maintenance of the
system.
- Upon completion of testing for leaks,
please ensure that all the pipe work is
properly insulated.
Step 4.1 Sensor
- Carefully remove the grommet from the
collector housing.
- Slide the grommet over the tempera-
ture sensor (included with the solar
controller).
- Insert the temperature sensor fully into
the immersion sleeve. Seal the collector
frame using grommet. Ensure correct
placement of the grommet.










