Technical data

SOLC220 - Free standing kit
Page 13 of 20
ST0117 – C 08/09
SOLAR
Step 2.4 Collector
- Determine the definitive upper spacing
of the T-pieces (4.1) on the collector.
- The mounting angle is determined by
the spacing H between the two T-
pieces.
- Screw the T-pieces tightly.
- For mounting options 30°, 35° and 40°
component 2.1 (rear strut 740mm
long) must be used.
Step 2.5 Collector
- Punch the two drainage holes at each
BOTTOM corner of the collector, ac-
cording to how it is mounted, with the
aid of a slotted screwdriver.
- To do so, punch at the bottom edge.
- To ensure that water can drain properly
from the collector, it is absolutely es-
sential that all drainage holes are
punched at the bottom corners (de-
pending on how the collector is
mounted on the kit).