Technical data

SOLC220 - Free standing kit
Page 12 of 20
ST0117 – C 08/09
SOLAR
Step 2.2 Collector
- Preassemble four T-pieces (4.1) for
each collector with M8 hexagonal bolts
(4.2) on the square nuts in the slot on
the rear of the collector (1).
- To do so, align the first square nut with
the help of the long side of the installa-
tion aid (4.4).
- Attach the T-piece and screw in a hex-
agonal bolt.
- Align the second square nut by turning
the installation aid and screw in an-
other hexagonal bolt.
Step 2.3 Collector
- Determine the definitive lower spacing
of the T-pieces (4.1) on the collector
(1).
- To do so, make sure the spacing G of
40 mm from the bottom edge of the
collector for the lower T-pieces is ob-
served.
- Screw the T-pieces tightly.
- To avoid damage to the collector, the
spacing G of 40 mm must be observed.