Installation Instructions Duo300n Duo400n Duo500n 1.3kW / 0.38kW 9.1kWh 1.95kW / 0.47kW 13.65kWh 2.6kW / 0.54kW 18.
A A Circuit Diagram B Charge Control Thermostat C Limit Thermostat D StorageHeater Elements F Room Sensing Thermistor G Core Sensing Thermistor H Controller PCB I User Display J Peak Supply K Radiant Element L Live N Neutral P Pilot Wire E Manual Fit Connector L1 Live Storage In L2 Live Storage Out L3 Live Radiant In L4 Live Radiant Out S1 Signal In S2 Signal Out N1 Neutral Out N2 Neutral Out M -2- Off Peak Supply
Dimensions (including clearances diagram) (millimetres) Wymiary (w tym schemat minimalnych odlegđoħci) (w milimetrach) Dimensioni (incluso lo schema degli spazi liberi) (millimetri) Dimensiones (milímetros) Dimensões (milímetros) D E B 75mm min. G 250mm min. 75mm min. C 150mm min. A F 110mm Model Modelo Modelo Modello Model Height Altura Altura Altezza Wys.
1 5 1 2 1 6 1. Feet 2. Accessories Bag 1. Patas 2. Bolsa de accesorios 1. Pés de apoio 2. Saco de acessóries 1. Piedini 2. Sacchetto accessori 1. Nogo 2.
10F 10E 11A 30mm 1. 11c 11D 6. 2. 5. 7. 4. 3. 1. Brick 2. 8mm Drill 3. 3” No. 10 Screws (supplied) 4. Length +15mm 1. Ladrillo 2. 8mm Ø 3. Incluye tornillos 3” No. 10 4. Longitud del taco +15mm 1. Tijolo 2. 8mm Perfurar 3. 3” No. 10 parafusos (fornacidos) 4. Comprimento da bucha +15mm 1. Mattone 2. Punta da 8mm 3. Inserti in fibra n. 10 (in dotazione) 4. Lunghezza inserto +15mm 1. Cegla 2. Wierto 8mm 3. 3” No. 10 4. Dđugoħè kođka rozporowego +15mm 5. Plaster 6. Low density block 7.
12A 12B 12C 13 14 15A 16 15B -6-
18 18A 18B 19A 19B 19C 19D 19E 19F 1 2 -7-
English THESE INSTRUCTIONS SHOULD BE READ CAREFULLY AND RETAINED FOR FUTURE REFERENCE NOTE ALSO THE INFORMATION GIVEN ON THE APPLIANCE TO ENSURE THIS APPLIANCE IS OPERATING CORRECTLY, IT IS ESSENTIAL TO PERFORM THE CHECK PROCEDURE DETAILED ON THE BACK PAGE OF THIS INSTRUCTION. THIS MUST BE COMPLETED BEFORE NORMAL OPERATION COMMENCES. IMPORTANT SAFETY ADVICE WARNING - This radiator is VERY HEAVY, it is essential that the radiator is FIXED SOUNDLY TO A WALL and mounted on a FIRM, LEVEL SURFACE.
INSTALLATION OF THE RADIATOR ASSEMBLY 7. Ensure the electronic components are not damaged when removing the panel. Carefully place the panel to one side. Check that the mains supply cables are not damaged. If they are to be replaced only heat resistant cable must be used (min. T85) for both the off peak cable and peak. Refer to sections 3, 19 and 20 for fitting the off peak and radiant element cables. 1. Open carton from the bottom. Remove feet and accessories bag from the polystyrene packaging. (Fig.
Panelled internal walls DO NOT USE 30MM SPACER ON INSIDE OF RADIATOR. If possible, locate the studding and use No. 10 size woodscrews. Where it is not possible to locate the studding use type M5 Rawlplug INTERSETS on securely fastened plasterboard panelling. For other wall materials the wall panel manufacturer should be consulted for details of suitable wall fixing devices. USE ONLY EXTERNALLY - SEE FIG. 11A. NOTE: UNDER NO CIRCUMSTANCES SHOULD THESE SCREWS BE REMOVED WITHOUT FIRST REMOVING 12.
RADIANT ELEMENT OVERRIDE 18. In its factory default setting, the radiant element will be allowed to operate for up to 2 hours after the beginning of the off peak charge period to maintain a comfortable room temperature if required. After 2 hours the radiant element will be automatically disabled until the end of the off peak charge period.
CHECK PROCEDURE FOR INSTALLERS FOLLOWING INSTALLATION THIS CHECK PROCEDURE SHOULD BE CARRIED OUR BY A COMPETENT INSTALLER ONLY. THE OPERATING INSTRUCTIONS ARE AVAILABLE FOR END USERS. DuoHeat has a built in self diagnostic function that enables both service engineers and end users to diagnose faults. Make sure that the peak supply is on before starting the diagnostic function. Adjust the LED’s down until only the blue frost protection LED is illuminated.