Installation Guide

8Wall tiling program
1.Use a parallel ruler to make sure the wall and
valve being parallel.
2.Use a knife to cut the rest of plastic edge
above the tiles.
Pl
ast
i
c
e
dg
e
a
bove th
e
ti
l
es
Wall
Tiles
1.Take off the plastic protection cover.
2.Put the cover board on the valve and tight
the handle firmly.
9Cover and handle installation
Notice :
The lines on thermostatic cartridge handle
bar and gears must be at the same level.
Alignment
7/16 8/16