Installation Guide
6、Pipe-connection diagram
7、Water test and leak detection
1.After connecting all pipes, please dis-assembling
the plastic protection cover ,and switch on/off the
cartridge , check all connections without any leakage,
and all connections connecting to the required
functional outlets.
2.Re-install the plastic protection cover to the
valve.
Notice : the lines on thermostatic cartridge handle
bar and gears must be at the same level.
Alignment
5/16 6/16