Installation Guide

Unit: inch
Φ8.8"
1.8"~2.4"
16"
1/2-14NPT
2-1/2-14NPT
2-1/2-14NPT
1/2-14NPT
36"~40"
47"~63"
78"~88"
Φ
7.1
"
2.68"
MAX40"
5.2"
103
°
1The size of the embedded box that needs to be drilled
is 5.3"*6.7".
2The depth of the embedded box is 1.8"-2.4". It's
better to drill the depth of 1.8"for blank wall.
wall
Tile surface
2.4"
1
.
8
"-2"
Hot water
Mixer
water
Mixer
water
cold water
5
.
3"
6
.
7
"
2
.
8
"
2
.
6
8
"
5.Technical drawing of drilling size
4.Technical drawing of product
6Pipe connection
Please drill the holes on the wall for the main body embedded part, hot and cold water inlet
pipes as well as shower arm connection pipes according to the basic product dimension drawing
as below.
Please make hot and cold water inlet pipe, the mixed water outlet pipe connect with control
valve,and tighten with the wrench
1
2
Testing Purpose: Flush the impurities and sludge in the pipeline
to avoid clogging and affect the effluent functions.
7Water testing and sealing testing
1After the pipe connection is completed, open the protective panel and cover, and then open the
cartridge, flush the pipeline; then close the cartridge to check the pressure resistance and sealing
performance of the pipeline, make sure there are no leakage.
2Block each outlet pipe with a stopper then open the cartridge to check if the pipe joint is well-
sealed and the pipe condition under pressure to ensure no leakage.