Installation guide
4–10 Placing a Label on a DSSI Cable . . . ................... 4–34
4–11 Placing a Label on the OCP Door. . . ................... 4–35
4–12 Placing a Label on the Magazine Tape ISE .............. 4–36
4–13 Power Controller Circuit Breaker . . ................... 4–37
4–14 Placing a Label on a DSSI Cable . . . ................... 4–43
4–15 Placing a Label on the OCP Door. . . ................... 4–44
4–16 Placing a Label on the Magazine Tape ISE .............. 4–45
4–17 Power Controller Circuit Breaker . . ................... 4–46
5–1 DECarray Storage Enclosure Locations ................. 5–5
5–2 Single-System Configuration Sheet . ................... 5–7
5–3 DSSI VAXcluster Configuration Sheet (Two-System) ....... 5–8
5–4 DSSI VAXcluster Configuration Sheet (Three-System) ...... 5–9
5–5 Removing a Filler Panel. . ........................... 5–11
5–6 AC Power Cord Retainer . ........................... 5–13
5–7 Installing the Slide Mount ........................... 5–15
5–8 Installing the Weldment Brackets . . ................... 5–17
5–9 Chassis Retainers with Front Cover Removed . . .......... 5–18
5–10 Securing the SF3x to the Weldment Brackets . . .......... 5–20
5–11 Adjusting the OCP ................................. 5–21
5–12 SF3x Transition Module DSSI Node ID Switches.......... 5–23
5–13 SF3x Enclosure Front View with Front Cover Removed . . . . 5–27
5–14 SF3x Storage Enclosure Rear View with Rear Cover
Removed ........................................ 5–28
5–15 Single-System Bus Configurations . . ................... 5–29
5–16 DSSI VAXcluster Bus Configurations ................... 5–30
5–17 Stripeset Bus Configurations ......................... 5–30
5–18 Cabling an SF3x in Through-Bus Mode ................. 5–34
5–19 SF3x Backplane ................................... 5–37
5–20 Cabling an SF3x in Split-Bus Mode . ................... 5–38
5–21 Positioning a Label on a DSSI Cable ................... 5–41
5–22 Chassis Retainers (Applicable Only to SF36-xx Installation
in an SF2xx Cabinet) ............................... 5–44
6–1 System Configuration Sheet (Single-System) . . . .......... 6–8
6–2 System Configuration Sheet (DSSI VAXcluster) . .......... 6–9
6–3 Removing a Filler Panel. . ........................... 6–11
6–4 AC Power Cord Retainer . ........................... 6–13
6–5 Installing the Slide Mount ........................... 6–15
ix










