Installation guide

Installing a DECarray Cabinet
4.4 Installing a DECarray Cabinet in a DSSI VAXcluster Configuration
4.4.4 DSSI VAXcluster Final Verification
Once the hardware installation, cabling and labeling, and the powering up
steps are complete, you are ready to configure the DSSI subsystem and verify
the correct operation of each ISE in the array with the system.
Refer to the KFMSA Module Installation and User Manual for detailed
information on the correct operation of each ISE. This manual contains
procedures for establishing the communications between the ISEs, the
adapter module, and the system. It also contains step-by-step procedures
for reconfiguring the system with its newly installed DSSI devices.
Refer to the manuals for the disk ISE and tape ISE for detailed information on
the local programs in the ISEs.
If at any time you detect a failure, refer to Chapter 9.
Once the verification is complete, close the cabinet doors; turn the hex-Allen
fasteners one quarter turn clockwise to lock them. The system is ready to be
turned over to the system manager.
4.5 Installing the DECarray Cabinet in a Stripeset
Configuration
This section describes how to install the DECarray cabinet in a stripeset
configuration. Make sure that all precautions for site preparation have been
completed. Refer to Chapter 2.
Follow these steps:
Cable the DECarray cabinet to the system (Section 4.5.1)
Fill out the configuration worksheet (Section 4.5.2.1)
Attach labels to DSSI cables and ISEs (Section 4.5.2)
Power up the DECarray after successfully installing (Section 4.5.3)
Check the DECarray for correct operation (Section 4.5.4)
Installing a DECarray Cabinet 4–39