Installation guide
Installing a DECarray Cabinet
4.4 Installing a DECarray Cabinet in a DSSI VAXcluster Configuration
4.4.2.3 Positioning the Labels
Once the labels have been filled out, place the labels on the DSSI cables and
the SF7x OCP doors. Also place a label on the front of the magazine tape ISE.
On the DSSI cable, place the label four inches behind the DSSI connector
(Figure 4–10).
Figure 4–10 Placing a Label on a DSSI Cable
LABEL
SHR-X0108-90
4–34 Installing a DECarray Cabinet










