Installation guide
E DECarray Configuration Sheets
Glossary
Index
Figures
1–1 Front View of the DECarray ......................... 1–3
1–2 SF3x Series Storage Enclosure with Front Cover
Removed ........................................ 1–7
1–3 SF7x Series Storage Enclosure ....................... 1–8
2–1 NEMA Plugs (for 881 and 887 Power Controllers) ......... 2–2
3–1 Shipping Bolts . ................................... 3–4
3–2 Ramp Installation on Shipping Pallet .................. 3–5
3–3 Storage Array Removal from the Pallet ................. 3–6
3–4 DECarray with a VAX 9000 Model 400 System . .......... 3–7
3–5 DECarray with a VAX 9000 Model 200 System . .......... 3–8
3–6 DECarray with a VAX 6000 System . ................... 3–9
3–7 Adjusting Leveler Feet . . . ........................... 3–10
3–8 Power Controller .................................. 3–12
3–9 SF3x Storage Enclosure Power Connection and Voltage
Selection with Rear Cover Removed. ................... 3–13
3–10 SF7x Storage Enclosure Power Connection and Voltage
Selection ........................................ 3–14
3–11 Magazine Tape Power Connection and Voltage Selection . . . . 3–15
4–1 SF3x Operator Control Panel ......................... 4–11
4–2 SF7x Operator Control Panel ......................... 4–13
4–3 Power Controller .................................. 4–15
4–4 Removing Terminators and Connecting DSSI Cables at the
System I/O Panel .................................. 4–18
4–5 Placing a Label on a DSSI Cable . . . ................... 4–22
4–6 Placing a Label on the SF7x Storage Enclosure . .......... 4–23
4–7 Placing a Label on the Magazine Tape ISE .............. 4–24
4–8 Power Controller Circuit Breaker . . ................... 4–25
4–9 Removing Terminators and Connecting DSSI Cables at the
System I/O Panel .................................. 4–31
viii










