Installation guide
Installing a DECarray Cabinet
4.4 Installing a DECarray Cabinet in a DSSI VAXcluster Configuration
4.4 Installing a DECarray Cabinet in a DSSI VAXcluster
Configuration
This section describes how to install the DECarray cabinet in a DSSI
VAXcluster configuration.
Make sure that all precautions for site preparation have been completed. Refer
to Chapter 2.
Follow these steps:
• Cable the DECarray cabinet to the systems in the DSSI VAXcluster
configuration (Section 4.4.1)
• Fill out the configuration worksheet (Section 4.4.2.1)
• Attach labels to DSSI cables and ISEs (Section 4.4.2)
• Power up the DECarray after successfully installing (Section 4.4.3)
• Check the DECarray for correct operation (Section 4.4.4)
4–28 Installing a DECarray Cabinet