Installation guide

Installing a DECarray Cabinet
4.4 Installing a DECarray Cabinet in a DSSI VAXcluster Configuration
4.4 Installing a DECarray Cabinet in a DSSI VAXcluster
Configuration
This section describes how to install the DECarray cabinet in a DSSI
VAXcluster configuration.
Make sure that all precautions for site preparation have been completed. Refer
to Chapter 2.
Follow these steps:
Cable the DECarray cabinet to the systems in the DSSI VAXcluster
configuration (Section 4.4.1)
Fill out the configuration worksheet (Section 4.4.2.1)
Attach labels to DSSI cables and ISEs (Section 4.4.2)
Power up the DECarray after successfully installing (Section 4.4.3)
Check the DECarray for correct operation (Section 4.4.4)