Installation guide
Installing a DECarray Cabinet
4.3 Installing the DECarray Cabinet in a Single-System Configuration
4.3.4 Powering Up the DECarray Cabinet
Once the DECarray cabinet has been installed and labeled, you are ready to
apply power. Follow the steps in order.
CAUTION
Make sure that the ac power switch on each storage enclosure and
magazine tape ISE installed is in the off position.
1. At the rear of the DECarray cabinet, turn the power controller on
(Figure 4–8). Make sure that the BUS/OFF/ON switch is in the down
position.
Figure 4–8 Power Controller Circuit Breaker
J10
J11
J12
J13
I
CB
O
FUSE
LABEL
CIRCUIT
BREAKER
POWER CORD
STRAIN RELIEF
GROMMETED
CORD
OPENING
POWER CONTROL
BUS CONNECTORS
POWER
CORD
FUSE
BUS/OFF/ON SWITCH
(SYMBOLS CLOCKWISE FROM TOP)
UNDELAYED
DELAYED
(0.5 SEC)
SERIAL/LOGO
LABEL
881
SHR-X0107-90
Installing a DECarray Cabinet 4–25