Installation guide

Installing a DECarray Cabinet
4.2 Inspecting the DECarray Cabinet
4.2 Inspecting the DECarray Cabinet
Before beginning the configuration, inspect the DECarray cabinet from the
front, then from the rear.
1. Open the front and rear cabinet doors.
a. Turn the two 3/16-inch hex-Allen fasteners at the right edge of the door
counterclockwise to unlock them.
b. For each door, grasp the door by its edges, and pull toward you.
2. Check the settings on the OCP of each storage enclosure, located at the
front of the DECarray cabinet (Figures 4–1 and 4–2).
For SF3x Enclosures:
a. Make sure the Ready and Write Protect switches are in the out
position.
b. Make sure the MSCP/Fault LED is unlit.
c. Make sure the dc power switch for each ISE in the enclosure is off.
Figure 4–1 SF3x Operator Control Panel
ABCDEF
Front
ABCDEF
Rear
Ready
Write
Protect
Fault
MA-0433-92.DG
Installing a DECarray Cabinet 4–11