Installation guide

Unpacking the DECarray
3.5 Inspecting the DECarray Cabinet
Figure 3–8 Power Controller
J10
J11
J12
J13
I
CB
O
FUSE
LABEL
CIRCUIT
BREAKER
POWER CORD
STRAIN RELIEF
GROMMETED
CORD
OPENING
POWER CONTROL
BUS CONNECTORS
POWER
CORD
FUSE
BUS/OFF/ON SWITCH
(SYMBOLS CLOCKWISE FROM TOP)
UNDELAYED
DELAYED
(0.5 SEC)
SERIAL/LOGO
LABEL
881
SHR-X0107-90
7. Check the ac power cords for each storage enclosure and magazine tape
installed. Make sure that each is correctly seated.
8. Make sure that the voltage selection switches for each storage enclosure
and magazine tape are in the correct position for the power supplied by the
installation site (Figures 3–9, 3–10, and 3–11).
9. Loosen the shipping screw on all magazine tapes in the storage array. This
screw is in the right rear upper corner.
10. Make sure that all DSSI cables internal to the storage array are firmly
seated.
11. Close the cabinet doors; turn the hex-Allen fasteners one quarter turn
clockwise to lock them.
3–12 Unpacking the DECarray