Installation guide
4.3.5 Single-System Final Verification . . . ................... 4–27
4.4 Installing a DECarray Cabinet in a DSSI VAXcluster
Configuration ........................................ 4–28
4.4.1 Cabling the DECarray Cabinet ....................... 4–29
4.4.2 Labeling the Cables ................................ 4–32
4.4.2.1 Completing the System Configuration Sheet .......... 4–32
4.4.2.2 Filling Out the Labels ........................... 4–33
4.4.2.3 Positioning the Labels ........................... 4–34
4.4.3 Powering Up the DECarray .......................... 4–37
4.4.4 DSSI VAXcluster Final Verification . ................... 4–39
4.5 Installing the DECarray Cabinet in a Stripeset Configuration. . 4–39
4.5.1 Cabling the DECarray Cabinet ....................... 4–40
4.5.2 Labeling the Cables ................................ 4–41
4.5.2.1 Completing the System Configuration Sheet .......... 4–41
4.5.2.2 Filling Out the Labels ........................... 4–42
4.5.2.3 Positioning the Labels ........................... 4–43
4.5.3 Powering Up the DECarray ......................... 4–46
4.5.4 Stripeset Final Verification .......................... 4–48
5 Installing the SF3x Storage Enclosure in a DECarray Cabinet
5.1 Unpacking the SF3x Storage Enclosure . ................... 5–2
5.2 Where to Install the SF3x Storage Enclosure ............... 5–4
5.3 Checking the System Configuration Sheet .................. 5–6
5.4 Installation Procedure ................................. 5–10
5.4.1 Preparing the DECarray Cabinet. . . ................... 5–10
5.4.2 Hardware Installation Procedures . . ................... 5–12
5.5 Cabling the SF3x in the DECarray Cabinet ................. 5–29
5.5.1 Through-Bus Configuration .......................... 5–31
5.5.1.1 Identifying DSSI Connectors on the System I/O Panel. . 5–31
5.5.1.2 Cabling Position 1 with a Magazine Tape ISE ......... 5–32
5.5.1.3 Cabling Positions 2, 3, 4, 7, and 8 .................. 5–34
5.5.2 Split-Bus Configuration . . ........................... 5–36
5.6 Powering Up the SF3x Enclosure......................... 5–39
5.6.1 Updating the System Configuration Sheet ............... 5–40
5.7 Labeling the DSSI Cables . . . ........................... 5–40
5.7.1 Filling Out the Labels . . . ........................... 5–41
5.7.2 Labeling the Cables ................................ 5–41
5.8 DSSI Subsystem Final Verification ....................... 5–42
5.9 Installing a SF36-xx Storage Enclosure in a SF2xx Cabinet . . . . 5–42
iv










