Installation guide

RF disk ISE (cont’d)
removal from SF7x storage enclosure,
9–11
S
Safety precautions
disconnecting power source, 4–1, D–1
unloading storage array, 3–3
using ESD straps, 3–2
SF2xx cabinet
SF36-xx storage enclosure installation,
5–42
SF74-xx storage enclosure installation,
6–56
SF36-xx storage enclosure installation, 5–42
SF3x-HK storage enclosure
installing disk ISE in, B–3
SF3x storage enclosure
cabling
for Single-system configuration, 5–31
in DECarray, 5–29
final verification, 5–42
installation procedure, 5–10
kit contents, 5–3
labeling cables, 5–40
labels, filling out, 5–41
powering up, 5–39
recommended environmental limits, 1–9
removing the RF disk ISE, 9–7
unpacking, 5–2
where to install, 5–4
SF3x-UK upgrade
installing disk ISE, B–3
securing array for, B–2
SF74-xx storage enclosure installation, 6–56
SF7x storage enclosure
cabling
for DSSI VAXcluster configuration,
6–44
for Single-system configuration, 6–34
in DECarray, 6–31
final verification, 6–56
installation into DECarray, 6–3
installation procedure, 6–10
kit contents, 6–5
SF7x storage enclosure (cont’d)
labeling cables, 6–53
labels, filling out, 6–54
powering up, 6–52
recommended environmental limits, 1–11
removing the RF disk ISE, 9–11
unpacking, 6–4
where to install, 6–6
SF7x-UK storage enclosure
installing disk ISE in, B–6
SF7x-UK upgrade
installation of, B–1
installing disk ISE, B–6
powering up, B–12
securing array for, B–2
Single-system configuration
cabling a magazine tape ISE, 8–22
cabling an SF7x for, 6–34
cabling for SF3x, 5–31
converting to DSSI VAXcluster
configuration, C–1
description of, 4–2
Single-System configuration
description of, D–2
Site preparation
for DECarray, 2–1
Slide mount, 5–14, 6–14, 8–14
Split-bus mode, 4–9, 5–4, 6–4, 6–6
cabling, A–29
converting to, 5–36, 6–21, 6–50
Split indicator
stripeset configuration, 6–50
SPLIT indicator
stripeset configuration, 4–47
storage enclosure
mounting of, 7–11
Storage enclosure overview, 1–6 to 1–13
Stripeset configurations, 4–9, 5–30, 6–6,
6–33, 6–50, A–21
Stripeset installation, 4–39
System configuration sheet, 8–6
checking for SF3x installation, 5–6
checking for SF7x installation, 6–7
completing for DSSI VAXcluster
configuration, 4–32, D–26
Index–4