Installation guide

Installation (cont’d)
of SF7x-UK upgrade kit, B–1
troubleshooting, 9–1
Installation with a VAX 4000
of DECarray, D–1
K
KFMSA bulkhead connector
for DSSI VAXcluster configuration, 4–30
for single-system configuration, 4–17
L
Labeling cables
DSSI VAXcluster conversion, C–13
magazine tape ISE installation, 8–36
SF3x installation, 5–40
SF7x installation, 6–53
Labeling the magazine tape ISE, 8–36, 8–37
Labeling the operator control panel, 6–55
SF7x installation, 6–53
Labels, filling out
DSSI VAXcluster configuration, 4–33
DSSI VAXcluster conversion, C–15
magazine tape ISE installation, 8–37
SF3x installation, 5–41
SF7x installation, 6–54
single-system configuration, 4–21
stripeset configuration, 4–42
Labels, placement of
DSSI VAXcluster configuration, 4–34
DSSI VAXcluster conversion, C–16
on DSSI cables, 5–41, 6–54, 8–37
on magazine tape ISE, 8–37
on SF7x operator control panel, 6–55
single-system configuration, 4–22
stripeset configuration, 4–43
M
Magazine tape ISE
cabling for DSSI VAXcluster configuration,
8–30
cabling for single-system configuration,
8–22
Magazine tape ISE (cont’d)
final verification, 8–39
installation
in a DECarray, 8–3
installation procedure, 8–9
kit contents, 8–5
labeling cables, 8–36
labels, filling out, 8–37
powering up, 8–35
shipping screw, 4–15
troubleshooting, 9–18
unpacking, 8–4
where to install, 8–6
Magazine tape subsystem
cabling, 8–22
MSCP switch, 4–12, D–5, D–19
P
Power-up
DECarray
after DSSI VAXcluster conversion,
C–19
DSSI VAXcluster configuration, 4–37
single-system configuration, 4–25
disk ISEs
after SF7x-UK upgrade, B–12
magazine tape ISE, 8–35
SF3x storage enclosure, 5–39
SF7x storage enclosure, 6–52
R
Ramp inspection, 3–3
RF3x disk ISE
installation into SF3x-HK storage
enclosure, B–3
RF7x disk ISE
bringing on-line, B–12
installation into SF7x-UK storage
enclosure, B–6
RF disk ISE
bringing on-line, 9–18
removal from SF3x storage enclosure,
9–7
Index–3