Installation guide
Index
B
Bringing on-line
disk ISE, 9–18, B–12
DSSI VAXcluster conversion, C–20
C
Cabling
split-bus, 6–43
through-bus, 6–41
Cabling diagrams, DECarray, A–1
DSSI VAXcluster configurations, A–12
stripeset configurations, A–21
chassis rail
assembly of, 7–1
chassis rail assembly
left position
installation, 7–8
right position
installation, 7–4
Chassis rails, SF400 enclosure
installation, 7–1
Configuration sheets, DECarray, E–1
Converting to DSSI VAXcluster configuration,
C–1
bringing DSSI VAXcluster conversion
on-line, C–20
final verification, C–21
labeling cables, C–13
labels, filling out, C–15
labels, placement of, C–16
powering up, C–19
securing array for, C–4
Converting to DSSI VAXcluster configuration
(cont’d)
system configuration sheet, C–13
through-bus mode conversion, C–6
Converting to split-bus mode, 5–36, 6–21,
6–50
Converting to through-bus mode, C–6
D
DECarray
cabling
DSSI VAXcluster configuration, 4–29,
D–21
single-system configuration, 4–16,
D–7
stripeset configuration, 4–40
cabling diagrams, A–1
configuration sheets, E–1
description of, 1–1
doors, how to close, 3–12
doors, how to open, 3–11
DSSI VAXcluster configuration, D–16
DSSI VAXcluster configurations, 4–5
final verification
of DSSI VAXcluster configuration,
4–39, D–28
of single-system configuration, 4–27,
D–15
of stripeset configuration, 4–48
inspection, 3–11, 4–11
DSSI VAXcluster configuration, D–19
single-system configuration, D–5
installation of, 4–1, D–1
Index–1










