Installation guide

Installing a DECarray with a VAX 4000 System
D.2 DSSI VAXcluster Installation of a DECarray
D.2.3 DSSI VAXcluster Final Verification
Once the hardware installation, cabling and labeling, and the powering up
steps are complete, you are ready to configure the DSSI subsystem and verify
the correct operation of each ISE in the DECarray with the system.
Refer to the system installation manuals and TF857 Magazine Tape ISE
Service Manual for detailed information on the correct operation of each
ISE. These manuals contain procedures for establishing the communications
between the ISEs, the adapter module, and the system. They also contain
step-by-step procedures for reconfiguring the system with its newly installed
DSSI devices.
Refer to the manuals for the disk ISE and tape ISE for detailed information on
the local programs in the ISEs.
Once the verification is complete, close the cabinet doors; turn the hex-Allen
fasteners one quarter turn clockwise to lock. The system is ready to be turned
over to the system manager.
D–28 Installing a DECarray with a VAX 4000 System