Installation guide

Converting a Single-System Configuration to a DSSI VAXcluster Configuration
C.2 Conversion Procedure
C.2.3.3 Placing the Labels
Once the labels have been filled out, place them on the DSSI cables and the
SF7x OCP doors. Also place a label on the front of the magazine tape ISE.
Place cable labels four inches behind the DSSI connector on both ends of the
DSSI cable (Figure C–7).
Figure C–7 Placing a Label on a DSSI Cable
LABEL
SHR-X0108-90
C–16 Converting a Single-System Configuration to a DSSI VAXcluster Configuration