Installation guide

Installing the Magazine Tape ISE in a DECarray Cabinet
8.2 Cabling the Magazine Tape ISE
6. Connect a 42-inch DSSI cable (PN BC21Q–3F) to the rightmost DSSI
connector at the rear of the SF7x in position 2 and to the bottom DSSI
connector at the rear of the magazine tape ISE in position 6.
7. Route this DSSI cable under the cable retainers on the appropriate side of
the cabinet.
8. Push the inner assembly back into the extrusion tube.
CAUTION
Use care not to disturb or damage power cords and DSSI cables that
are already connected to the DSSI I/O panel.
9. If no SF7x storage enclosure is installed in position 2, then at the rear of
the DECarray, locate the DSSI I/O panel at the bottom. Use a 3/16-inch
flatblade screwdriver to loosen the two captive screws at the right of the
panel.
10. Swing open and remove the panel from the cabinet frame.
CAUTION
Use care not to disturb or damage power cords and DSSI cables that
are already connected to the DSSI I/O panel.
11. Remove the two Phillips screws that hold the panel blank in port 2 of the
I/O panel.
12. Install a 70-inch DSSI cable (PN BC21R–5L) in place of the panel blank
you just removed in the previous step.
13. Connect the other end of this cable into the top DSSI connector at the rear
of the magazine tape ISE (Figure 8–12).
14. Route this DSSI cable under the cable retainers on the left side of the
cabinet.
15. Connect a 108-inch DSSI cable (PN BC21Q–09) into the port you just
installed in the previous steps. Tighten the retainer screws with your
fingers.
Installing the Magazine Tape ISE in a DECarray Cabinet 8–27