Installation guide

Installing the Magazine Tape ISE in a DECarray Cabinet
8.1 Installing the TF8x7 Storage Enclosure
8.1.4.2 Hardware Installation Procedures
Perform the following steps completely and in the order presented.
CAUTION
Before performing the following steps, refer to the system documenta-
tion for the correct steps to perform an orderly shutdown of the system
that the DECarray is connected to.
1. Install the ac power cord (Figure 8–4).
a. Swing open and remove the panel from the cabinet frame.
CAUTION
Use care not to disturb or damage power cords and DSSI cables that
are already connected to the DSSI I/O panel.
b. Locate the ac power cord retainer bracket at the third level of the
DECarray cabinet.
c. Loosen lower screw of the ac retainer bracket. Remove the upper ac
power cord retainer bracket screw and tilt the retainer 45 degrees.
Then retighten the lower screw.
d. Place ac power cord in the retainer space with the shrouded male plug
end inside cabinet side rail.
e. Loosen the lower screw and put the retainer bracket back to its original
position. Then reinsert the upper screw and tighten both the top and
bottom screws.
f. Connect the male end of the ac power cord to the first available outlet
on the power controller.
8–12 Installing the Magazine Tape ISE in a DECarray Cabinet