Installation guide
6–6 Installing the Weldment Brackets . . ................... 6–17
6–7 Chassis Retainers ................................. 6–18
6–8 Securing the SF7x to the Weldment Brackets . . .......... 6–20
6–9 Changing an SF7x to Split-Bus Mode .................. 6–22
6–10 Adjusting the OCP ................................. 6–23
6–11 DSSI ID Switch Settings . ........................... 6–25
6–12 Installing the OCP on the SF7x Enclosure............... 6–27
6–13 Drive DC Power Switches ........................... 6–29
6–14 AC Power Switch, Voltage Selections, and Power Cord . . . . . 6–30
6–15 Single-System Bus Configurations . . ................... 6–32
6–16 DSSI VAXcluster Bus Configurations ................... 6–33
6–17 Stripeset Bus Configurations ......................... 6–33
6–18 Installing the 70- and 108-Inch DSSI Cables............. 6–38
6–19 SF7x Storage Enclosure (rear view) . ................... 6–39
6–20 Changing an SF7x to Split-Bus Mode .................. 6–51
6–21 Placing a Label on a DSSI Cable . . . ................... 6–54
6–22 Placing a Label on the OCP Door. . . ................... 6–55
6–23 Chassis Retainers (Applicable Only to SF74-xx Installation
in an SF2xx Cabinet) ............................... 6–58
7–1 Cabinet Frame Mounting Hole Locations for Round
Standoffs ........................................ 7–3
7–2 Chassis Rail Assembly . . . ........................... 7–4
7–3 Right Position Chassis Rail Installation................. 7–7
7–4 Left Position Chassis Rail Assembly Installation .......... 7–10
7–5 Right Position Enclosure Mounting . ................... 7–12
7–6 Left Position Enclosure Mounting . . ................... 7–13
8–1 System Configuration Sheet (Single-System) . . . .......... 8–7
8–2 System Configuration Sheet (Dual-System) .............. 8–8
8–3 Removing a Filler Panel. . ........................... 8–11
8–4 AC Power Cord Retainer . ........................... 8–13
8–5 Installing the Slide Mount ........................... 8–15
8–6 Installing the Weldment Brackets . . ................... 8–16
8–7 Chassis Retainers ................................. 8–18
8–8 Securing the Tube to the Weldment Brackets . . .......... 8–19
8–9 AC Power Switch, Voltage Selections, and Power Cord . . . . . 8–21
8–10 Installing the 42- and 70-Inch DSSI Cable (Position 5) . . . . . 8–24
8–11 Installing the 70-Inch DSSI Cable (Position 6) . .......... 8–26
x










