Installation guide
Contents ix
5–16 Single-Host Bus Configurations . . . . . . . . . . . . . . . . . . . . . . . 5–33
5–17 Dual-Host Bus Configurations . . . . . . . . . . . . . . . . . . . . . . . . 5–34
5–18 Installing the 42-Inch DSSI Cable for Position 1 . . . . . . . . . . 5–40
5–19 Installing the 70- and 108-Inch DSSI Cables for Position 2 . . 5–42
5–20 Installing the 42-Inch DSSI Cable (Position 2) . . . . . . . . . . . 5–44
5–21 Installing the 42-Inch DSSI Cable (Position 2) . . . . . . . . . . . 5–46
5–22 Installing 70- and 108-Inch DSSI Cables for Position 4 and 7 5–49
5–23 Installing the 42-Inch DSSI Cable to Position 3 and 8 . . . . . . 5–51
5–24 Installing the 42-Inch DSSI Cable (Position 1) . . . . . . . . . . . 5–55
5–25 Installing the 70- and 108-Inch DSSI Cables for Position 2 . . 5–57
5–26 Installing the 42-Inch DSSI Cable for Position 2 . . . . . . . . . . 5–60
5–27 Installing the 70-Inch DSSI Cables (Position 3) . . . . . . . . . . . 5–62
5–28 Installing the 70- and 108-Inch DSSI Cables for Position 4 . . 5–65
5–29 Installing the 70- and 108-Inch DSSI Cables for Position 7 . . 5–68
5–30 Installing the 70- and 108-Inch DSSI Cables for Position 8 . . 5–71
5–31 Placing a Label on a DSSI Cable . . . . . . . . . . . . . . . . . . . . . . 5–75
5–32 Placing a Label on the OCP Door. . . . . . . . . . . . . . . . . . . . . . 5–76
6–1 Subsystem Locations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–7
6–2 System Configuration Sheet (Single-Host) . . . . . . . . . . . . . . . 6–9
6–3 System Configuration Sheet (Dual-Host) . . . . . . . . . . . . . . . . 6–10
6–4 Removing a Filler Panel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–13
6–5 AC Power Cord Retainer . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–15
6–6 Installing the Slide Mount . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–18
6–7 Installing the Weldment Brackets . . . . . . . . . . . . . . . . . . . . . 6–20
6–8 Chassis Retainers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–22
6–9 Securing the Tube to the Weldment Brackets . . . . . . . . . . . . 6–23
6–10 AC Power Switch, Voltage Selections, and Power Cord . . . . . 6–25
6–11 Installing the 42-Inch DSSI Cable (Position 5) . . . . . . . . . . . 6–28
6–12 Installing the 42-Inch DSSI Cable (Position 6) . . . . . . . . . . . 6–30
6–13 Installing the DSSI Cables . . . . . . . . . . . . . . . . . . . . . . . . . . . 6–34
6–14 Installing the 42-Inch DSSI Cable (Position 6) . . . . . . . . . . . 6–36
6–15 Installing the 42-Inch DSSI Cable (Position 6) . . . . . . . . . . . 6–38
6–16 Installing the 42-Inch DSSI Cable (Position 6) . . . . . . . . . . . 6–40
6–17 Placing a Label on a DSSI Cable . . . . . . . . . . . . . . . . . . . . . . 6–43
6–18 Placing a Label of on the Magazine Tape Subsystem . . . . . . . 6–45
7–1 Powering Down the SF72 Storage Enclosure . . . . . . . . . . . . . 7–7










