Installation guide

4–48 Installing an SF200 Storage Array with a VAX 6000 Series System
2. At the rear of the storage array, turn on each magazine tape
subsystem installed (if present). Power up position 5, then 6. See
Figure 4–25. Observe the front panel. If a failure occurs, refer to
Chapter 7.
SHR-X0141B-90-CPG
DSSI
CONNECTORS
AC RECEPTACLE
AC POWER
SWITCH
Figure 4–25 Magazine Tape Subsystem AC Power Switch