Installation guide

Installing an SF200 Storage Array with a VAX 6000 Series System 4–43
4.4.3.2 Filling Out the Labels (Dual-Host)
There are two sizes of labels: the larger one for the DSSI cables, and the
smaller one for the inside of the SF72 OCP door and the system I/O panel.
Refer to the inside cover of the SF Family Label Booklet (part number
36–32882–01) for the instructions on what information to put on each of
the two types of labels.
For the dual-host configuration, the following colored labels are to be used
on the SF72 OCP door, the front panel of the magazine tape subsystem,
and all DSSI cables.
Label Color Port/Position
Blue Port 1, positions 5 and 1, port 9
Red Port 2, positions 6 and 2, port 10
Yellow Port 3, position 3, port 11
Green Port 4, position 4, port 12
Blue with white strip Port 5, position 7, port 13
Red with white strip Port 6, position 8, port 14
Proceed once you have filled the cable and OCP labels according to the
instructions on the inside cover of the SF Family Label Booklet (part
number 36–32882–01).