Installation guide

4–12 Installing an SF200 Storage Array with a VAX 6000 Series System
5. For each SF72 storage enclosure and magazine tape subsystem
installed, check that the ac power cord is correctly seated (Figures 4–4
and 4–5).
6. Ensure that each SF72 storage enclosure and magazine tape
subsystem has the correct voltage selected for the power supplied
to the 881 power controller. Note that each has a voltage label for its
factory setting.
7. Ensure that the voltage selection switches for each SF72 storage
enclosure and magazine tape subsystem are in the correct position for
the power supplied on the 881 power controller.
8. If the shipping screw on all magazine tape subsystems present has
not been loosened, do so at this time. This screw is in the rear upper
right corner of the subsystem. Loosen the screw; do not remove it.
9. Ensure that all DSSI connectors in the SF200 storage array are firmly
seated.