Installation guide

4–6 Installing an SF200 Storage Array with a VAX 6000 Series System
4.3 Single-Host Installation of an SF200 Storage
Array
This section provides the procedures for installing the SF200 storage
array in a single-host configuration correctly and safely. Digital Customer
Services or trained installing personnel must perform the procedures.
Ensure that all precautions for site preparation have been completed.
Refer to Chapter 2.
The procedures provide the steps to:
Inspect the SF200 storage array for correct configuration
(Section 4.3.1)
Cable the SF200 storage array with an existing VAX 6000 series
system in the single-host configuration (Section 4.3.2)
Power up the SF200 storage array after a successful installation
(Section 4.3.4)
Verify the SF200 storage array for correct operation (Section 4.3.5)