Installation guide
Unpacking and Placing an SF200 Storage Array with a VAX 6000 Series System 3–13
7. Check the ac power cords for each SF72 enclosure and magazine tape
subsystem installed. Make sure that each is correctly seated (Figures
3–8 and 3–9).
8. Ensure that the voltage selection switches for each SF72 storage
enclosure and magazine tape subsystem are in the correct position for
the power supplied by the installation site (Figures 3–8 and 3–9).
9. Loosen the shipping screw on all magazine tape subsystems in the
storage array. This screw is in the right rear upper corner.
10. Ensure that all DSSI cables internal to the storage array are firmly
seated.
11. Close the cabinet doors; turn the hex-Allen fasteners one quarter turn
clockwise to lock.










