Installation guide

C–16 Converting a Single-Host Configuration to a Dual-Host Configuration
C.2.3.2 Filling Out the Labels
There are sizes of colored labels. The larger label is for the DSSI cables.
The smaller label is for the inside of the SF72 stroage enclosure OCP
door, the front panels of a magazine tape subsystem and the host system
I/O panel.
Refer to the inside cover of the SF Family Label Booklet, part number
36–32882–01, for the instructions on what information to put on each of
the two types of labels.
For dual-host, the following colored labels are to be used on the SF72
storage enclosure OCP doors, magazine tape subsystem front panels, and
all DSSI cables.
COLOR SF200 Port/SF200 Position
Blue labels port 1, positions 5 and/or 1, port 9
Red labels port 2, positions 6 and/or 2, port 10
Yellow labels port 3, position 3, port 11
Green labels port 4, position 4, port 12
Blue with white strip labels port 5, position 7, port 13
Red with white strip labels port 6, position 8, port 14
Once you have filled the cable and OCP labels according to the instruction
on the inside cover of the SF Family Label Booklet, part number 36–
32882–01, then proceed.
C.2.3.3 Placing the Labels
Now that the labels have all been filled out, place the labels on the DSSI
cables and the SF72 OCP doors. Also place a label on the front of the
magazine tape subsystem.
Cable labels are placed two inches behind the DSSI connector on both
ends of the DSSI cable. Refer to Figure C–7.