Installation guide
3–6 Unpacking and Placing an SF200 Storage Array with a VAX 6000 Series System
7. Position the unloading ramps on the pallet by fitting the grooved end
of each ramp over the metal mating strip on the pallet.
8. Screw the cabinet levelers all the way up until the storage array
cabinet rests on its rollers on the pallet.
9. Loosen the locking nuts on all four leveler feet.
10. Carefully roll the array down the ramps. Three people are required to
unload the storage array from the shipping pallet (Figure 3–3).










