Installation guide
Unpacking and Placing an SF200 Storage Array with a VAX 6000 Series System 3–5
5. Remove the shipping brackets from the cabinet levelers.
6. Extend the ramp to its full length, and insert the steel dowel as shown
in Figure 3–2.
LEFT
UNLOADING
RAMP
SHIPPING
PALLET
RIGHT RAMP
ATTACHES HERE
STEEL
DOWEL
RIGHT
UNLOADING
RAMP
EXTEND RAMP TO
FULL LENGTH
CXO-688C_S
SHR_X1103_89_SCN
Figure 3–2 Ramp Installation on Shipping Pallet










