Installation guide
3
Unpacking and Placing an SF200 Storage
Array with a VAX 6000 Series System
Before unpacking and placing the SF200 storage array, ensure that the
site is ready to receive the array. Refer to Chapter 2 for site preparation
information and to Chapter 1 for array specifications.
This chapter describes the steps to:
• Correctly unpack the SF200 storage array (Section 3.1)
• Remove the SF200 storage array from the shipping pallet (Section 3.2)
• Place the SF200 storage array with an existing VAX 6000 series
system (Section 3.3)
• Level the SF200 storage array (Section 3.4)
• Inspect the SF200 storage array before installation (Section 3.5)
3–1










