Installation guide

Installing the Magazine Tape Subsystem in an SF200 Storage Array 6–3
6.1 Steps to Install
The magazine tape subsystem that you are installing contains a tape ISE
and the tape cartridge loader assemblies.
This section contains several major parts. The first part explains the
steps necessary to:
Unpack, inspect for damage, and identify parts
Determine where to install the magazine tape subsystem
Read and fill out the system configuration sheet
The next part explains the steps to install the magazine tape subsystem
itself:
Prepare the array cabinet to receive a magazine tape subsystem
Install the supporting hardware and magazine tape subsystem, and
set the DSSI ID switches
Cable the magazine tape subsystem to comply with the DSSI bus
cabling conventions
The last part explains the steps to:
Power up the magazine tape subsystem, run the power-on self-test,
and run the configuration programs
Label all cables and operator control panels
Verify the operation of the enclosure after a successful installation
Follow all the steps in each of these parts in the order they are presented
and do not skip any steps.
Remember that the magazine tape subsystem installs in positions 5 and 6
only.
The first step is to unpack the shipping container. Refer to Section 6.1.1.
6.1.1 Unpacking the Magazine Tape Subsystem
The subsystem is shipped in an environmental barrier bag with desiccant,
the container, and all packing materials.
NOTE
After unpacking, retain the container and all packing materials.