Installation guide
Installing the SF72 Storage Enclosure in an SF200 Storage Array 5–13
5.1.4.2 Hardware Installation Procedures
Perform the following steps in full and in the order presented.
WARNING
Before performing the following steps, refer to the system
documentation for the correct steps to perform an orderly
shutdown of the system that the storage array is connected to.
1. Install the ac power cord (Figure 5–5).
a. Go to rear of cabinet. Open the DSSI I/O panel by loosening the
two captive screws on the right.
CAUTION
Use care not to disturb or damage power cords and DSSI
cables that are already connected to the DSSI I/O panel.
b. Locate the ac power cord retainer bracket at the level that you are
installing the SF72 storage enclosure.
c. Loosen the lower screw of the ac retainer bracket. Remove the
upper ac power cord retainer bracket screw and tilt the retainer
45 degrees. Then retighten the lower screw.
d. Place the ac power cord in the retainer space with the shrouded
male plug end inside the cabinet side rail.
e. Leave approximately 0.6 meter (2 feet) of slack at the position
location.
f. Loosen the lower screw and put the retainer bracket back to its
original position. Then reinsert the upper screw and tighten both
the top and bottom screws.
g. Connect the male end of the ac power cord to the first available
outlet on the 881 power controller.










