Unit installation

-10-
2)Tilt the maintenance cover up
as shown by arrow a and lift
it out in the direction shown by
arrow b (see diagram).
(Go to step 3.)
3)Insert the HDD unit's cable
connector completely into IDE
I/F 1.
4)Attach the HDD unit using the
four (4) attachment screws. (See
diagram) The torque should be
0.5 to 0.6 N•m.
5) Replace the PS-B unit's cover
and reattach all four (4)
attachment screws. The torque
should be 0.6 to 0.8 N•m. If you
used the maintenance cover,
replace that cover and fasten the
its two (2) attachment screws.
The torque should be 0.5 to 0.6
N•m.
b
a
IDE I/F 1
CableHDD unit
Front of
PS-B unit