User`s guide
Installing Expansion Boards
8-17
2. Press [Enter] to display the SCU main menu and then [Enter] again
to continue.
The SCU requests that you load all appropriate .CFG files for the
newly installed EISA expansion boards. Afterwards, the SCU
displays the Configure Your Computer menu.
3. From the Configure Your Computer menu, select “Step 3:
View or Edit Details,” to verify that all EISA expansion boards were
installed and configured correctly.
NOTE: An EISA expansion board might require an IRQ to
be set. If so, select that board and choose an IRQ from the
list provided. This list displays IRQs that are either not
assigned or can be re-assigned. If you select an IRQ that
conflicts with another expansion board in your server, a
menu appears informing you of the expansion board that is
in conflict, its current settings, and the settings that will
change if you choose to set that IRQ.
4. Select “Step 5: Save and Exit,” to save your configuration and exit
the SCU.
Installing PCI Expansion Boards
To install a PCI expansion board:
NOTE: Read and fully understand your optional expansion
board’s documentation before installing the expansion
board.
1. Turn off your server.
2. Disconnect all external devices, ac power, and monitor power.
3. Unlock and remove the left side panel.
4. Unscrew and remove the metal filler plate from the selected PCI
expansion slot.