Instruction manual

2–7
Scheduled Maintenance
9. Install the hammer bank cover assembly (page 5–15).
10. Install the shuttle frame assembly (page 5–42).
11. Install the shuttle cover assembly (page 5–16).
12. Clean the card cage fan assembly (page 2–8).
Hammer Tip
Hammer Bank
Cover Assembly
Alignment Pin (2)
(See below)
Hammer Bank Cover
(Thick plate)
Ribbon Mask
(Thin plate)
Hammer Bank Cover
Alignment Pin
NOTE:
475 LPM Hammer
Bank shown
Figure 2–2. Cleaning the Shuttle Frame Assembly