Instruction manual

5–6
Replacement Procedures and
Illustrated Parts List
Installation
1. Install the paper feed timing belt over the splined shaft pulley and the
motor pulley. Slide the motor pulley onto the paper feed motor shaft.
2. Holding a 0.040 inch feeler gauge between the pulley collar and the
motor body, torque the 7/64 inch collar screw to 25
± 2 inch–pounds
(2.82
± 0.23 NSm).
3. Using the straight end of a force gauge, apply 12 pounds (53.38 N) of
pressure to the paper feed drive motor. Use the splined shaft to steady the
gauge.
4. Reduce pressure to 9 pounds (40.03 N) and torque the 5/16 inch paper
feed motor mount screws to 18
± 2 inch–pounds (2.03 ± 0.23 NSm).
5. Snap the timing belt cover into the slots in the side plate (page 5–59,
Figure 5–10).
NOTE: The anti–static brush bristles must face downward.
6. Install the barrier shield, anti–static brush, and four screws (page 5–59,
Figure 5–10).
7. Install the paper path (page 5–29).
8. Return the printer to normal operation (page 4–3).