User`s guide
Setpoint Scheduler
Setup/Edit Setpoint Schedule
Release E UMC800 Control Builder User’s Guide 171
1/01
Setup/Edit Setpoint Schedule
Editing a schedule
The “Edit Setpoint Schedule” dialog box lets you set up or edit a schedule from the schedules listed in the
“Setpoint Schedule Pool.”
Table 42 Setpoint schedule setup/edit
SELECT A SCHEDULE
• Make sure you have clicked on “Properties” and have
configured the properties for that specific Schedule.
See Setpoint schedule properties (page 170) before
proceeding.
• Click on a schedule name in the active field and
select “Edit” or double click on the Schedule name.
The “Schedule Edit” dialog box will appear with the
selected Schedule indicated on the top banner. See
next view.
• To ADD a Segment
Click on ADD. A new Segment number will appear at
the bottom of the segment list.
• To INSERT a Segment
Click on a segment number in the field and click
“Insert”. A segment will be inserted after the segment
selected. This will change all the segment numbers
following the insertion.
• To DELETE a Segment
Click on a segment number in the field and click
“Delete”. The segment will be deleted and all the
segment numbers following the deletion will be
changed.
• To EDIT a Segment
Click on a segment number in the field and click
“Edit”.
Then refer to Edit the schedule segments (page 172)
for Edit Segment Data Entry information.
• To EDIT the Auxiliary Outputs for the Segment
Click on a segment number in the field and click on
the “Edit Aux” button.
Then refer to Edit the Aux Out values (page 174) for
Edit Auxiliary Output Data Entry information.