Setpoint Scheduler
Setpoint Schedule Configuration
Release E UMC800 Control Builder User’s Guide 169
1/01
Setpoint schedule pool
Introduction
The SP Schedule Pool lets you add or delete a schedule on a list of configured schedules. Through this
dialog box you will set the properties for each schedule and then set up or edit the information for each
segment that make up a schedule.
When you select “Setpoint Schedules” from the
Configure menu, the “Setpoint Schedule Pool” dialog
box will be displayed. Through this display, you will add
a new schedule or delete an existing one and also enter
the set properties function and the “Edit Schedule”
function to set up each schedule.
• To ADD a Schedule:
Select ADD on the dialog box. The “Setpoint
Schedule Properties” dialog box will open.
See Setpoint schedule properties (page 170) for
instructions.
• To EDIT a Schedule:
Select a Schedule then click on “Edit Schedule”. The
“Edit Setpoint Schedule” dialog box will appear.
See Editing a schedule (page 171) for
instructions.
• To EDIT the Properties of an Existing Schedule:
Select a Schedule name then click on “Properties”.
The “Setpoint Schedule Properties” dialog box will
open.
See Setpoint schedule properties (page 170) for
instructions.
• To ASSIGN LABELS to the Setpoint Schedule
Display:
Select a Schedule name then click on “SPS Display”.
The “Setpoint Schedule Display Configuration” dialog
box will open.
See Setpoint Scheduler Display Configuration
(page 119) for instructions.
• To DELETE a Schedule:
Click on a schedule name and then click “Delete”.