Setpoint Scheduler
Setpoint Schedule Configuration
Release E UMC800 Control Builder Users Guide 169
1/01
Setpoint schedule pool
Introduction
The SP Schedule Pool lets you add or delete a schedule on a list of configured schedules. Through this
dialog box you will set the properties for each schedule and then set up or edit the information for each
segment that make up a schedule.
When you select Setpoint Schedules from the
Configure menu, the Setpoint Schedule Pool dialog
box will be displayed. Through this display, you will add
a new schedule or delete an existing one and also enter
the set properties function and the Edit Schedule
function to set up each schedule.
To ADD a Schedule:
Select ADD on the dialog box. The Setpoint
Schedule Properties dialog box will open.
See Setpoint schedule properties (page 170) for
instructions.
To EDIT a Schedule:
Select a Schedule then click on Edit Schedule. The
Edit Setpoint Schedule dialog box will appear.
See Editing a schedule (page 171) for
instructions.
To EDIT the Properties of an Existing Schedule:
Select a Schedule name then click on Properties.
The Setpoint Schedule Properties dialog box will
open.
See Setpoint schedule properties (page 170) for
instructions.
To ASSIGN LABELS to the Setpoint Schedule
Display:
Select a Schedule name then click on SPS Display.
The Setpoint Schedule Display Configuration dialog
box will open.
See Setpoint Scheduler Display Configuration
(page 119) for instructions.
To DELETE a Schedule:
Click on a schedule name and then click Delete.