User`s guide

Setpoint Scheduler
Setpoint Schedule Configuration
168 UMC800 Control Builder Users Guide Release E
1/01
Setpoint Schedule Configuration
Overview
Introduction
Setpoint Schedule configuration provides a quick and easy way to create, edit, and save up to 10 different
Setpoint Schedules for the Setpoint Scheduler (SPS) control blocks in the configuration. An operator can
interact with the configured schedules through the Setpoint Program Operate display at the operator
interface or operation can be directed through integral actions connected by softwiring functions in the
Control Builder.
Setpoint scheduler display configuration
ATTENTION
Before you proceed with the Setpoint Schedule configuration, refer to Setpoint Scheduler
Display Configuration (page 119) and assign the appropriate labels for the Setpoint
Scheduler displays.
Assigning these labels first will aid you in the schedule configuration process. These labels will
appear in the configuration dialog boxes.
Configuration functions
There are three basic functions that you will use to configure a Setpoint Schedule.
Setpoint Schedule Pool
The SP Schedule Pool lets you add or delete a schedule on a list of configured schedules. Through
this dialog box you will set the properties for each schedule and set up or edit the information for
each segment that make up a schedule.
Setpoint Schedule Properties
Setpoint Schedule Properties is information for the schedule that a Label, a Jog Segment, Time
Units, and Guaranteed Hold Limits for Each of the eight setpoints.
Setpoint Schedule Setup (EDIT)
Setpoint Schedule Setup or Edit consists of configuring each segment of the schedule and
assigning values for all eight Setpoints of the segment and the Guaranteed Hold Type for each.
You can also set up to 16 events for each segment. Time Units, Recycle Segment, and Recycle
Counts selections are included on this dialog box.
You can also assign values to all eight Auxiliary Outputs for each segment by clicking the Edit
Aux button on the dialog box.