Specifications

Chapter 12: Removal and Replacement Procedures --- Fuser and Paper Exit
12-13
RRP 4.6 Heater Rod
Removal
1. Open the Rear Cover (RRP 1.1).
2. Remove all of the covers except the Front Transport Assembly.
3. Remove the Fuser Assembly (RRP 4.1).
4. Remove the Pressure Roll (RRP 4.2).
5. Remove the two 8mm gold screws and washers securing the Heater
Rod at both ends of the Fuser Assembly .
6. Remove the two tapped 8mm gold screws securing the Fuser Frame R
to the Fuser Assembly.
7. Remove the Frame along with the Idler Shaft and Gear Idler.
NOTE: Hold the Heater Rod when removing these components.
8. Carefully slide the Heater Rod out of the Heat Roll.
NOTE: Do not touch the glass rod with your fingers. Hold the rod by the
ends.
Replacement
1. Carefully slide the Heater Rod into the Heat Roll.
2. Reinstall the 8mm gold screw and washer securing the Heater Rod and
white wire from P/J 101-2, to the left end of the Fuser Assembly.
3. Reinstall the Fuser Frame R, along with the Idler Shaft and Gear Idler,
and secure the frame with two tapped 8mm gold screws.
4. Reinstall the 8mm gold screw and washer securing the Heater Rod to
the right end of the Fuser Assembly.
5. Reinstall the Pressure Roll.
6. Reinstall the Fuser Assembly.
7. Reinstall all covers.