Specifications

C.32
Dimensional Drawings
C
GE Power Controls
Copperwork must be supported within 200mm of breaker connections – busbars or cables.
All connections to be tightened to 50Nm.
Minimum space to earth metal
and for arc chute removal
100 to door
Minimum clearance
to breaker side.
Fascia centre
Fascia centre
Arc chute
removal
182 Min
Insulated metal or
insulated sheet
(customer supplied)
The cut-out
dimensions give an
approximate nominal
clearance of 3mm
around ACB fascia.
These sizes are for
guidance and can be
scaled if a different
aperture is required.
ACB fascia
cut-out dimensions
Copperwork must be supported within 200mm of breaker connections – busbars or cables.
All connections to be tightened to 50Nm.
Arc chute
removal
182 Min
100 to door
Minimum space to earth
metal and for arc chute
Minimum clearance to
breaker side.
Fascia centre
Fascia centre
Insulated metal or insulated
sheet (customer supplied)
The cut-out
dimensions give an
approximate nominal
clearance of 3mm
around ACB fascia.
These sizes are for
guidance and can be
scaled if a different
aperture is required.
ACB fascia
cut-out dimensions
Front Access Connection
Fixed Pattern
Type H - 4 pole - Frame size 2, In = 800A to 4000A (max)
Type H - 3 pole - Frame size 2, In = 800A to 4000A (max)