Specifications
C.26
Dimensional Drawings
C
GE Power Controls
Type N - 4 pole - Frame size 2, In = 2000A to 4000A (max)
100 to door
Minimum space to earth metal
and for arc chute removal
182 Min
Arc chute
removal
Minimum clearance
to breaker side.
Insulated metal or
insulated sheet
(customer supplied)
Fascia centre
Fascia centre
Copperwork must be supported within 200mm of breaker connections – busbars or cables.
All connections to be tightened to 50Nm.
The cut-out
dimensions give an
approximate nominal
clearance of 3mm
around ACB fascia.
These sizes are for
guidance and can be
scaled if a different
aperture is required.
ACB fascia
cut-out dimensions
Minimum space to earth metal
and for arc chute removal
182 Min
Minimum clearance
to breaker side.
100 to door
Copperwork must be supported within 200mm of breaker connections – busbars or cables.
All connections to be tightened to 50Nm.
Fascia centre
Fascia centre
Insulated metal or
insulated sheet
(customer supplied)
Arc chute
removal
The cut-out
dimensions give an
approximate nominal
clearance of 3mm
around ACB fascia.
These sizes are for
guidance and can be
scaled if a different
aperture is required.
ACB fascia
cut-out dimensions
Type N - 3 pole - Frame size 2, In = 2000A to 4000A (max)
Front Access Connection
Fixed Pattern